Belovac Vacuum Forming Machine: Difference between revisions

From Pumping Station One
Mariano (talk | contribs)
No edit summary
Mariano (talk | contribs)
No edit summary
Line 11: Line 11:
|contact = [[User:Rtystgeeke]]
|contact = [[User:Rtystgeeke]]
|value = tbd
|value = tbd
|image =  
|image = [[File:Belovac Vacuum Former Main.jpg|300px]]
}}
}}


Line 38: Line 38:
===Usage Steps===
===Usage Steps===


1. Insert Material into Frame
The following instructions are an initial release of how to run the machine.
2. Secure Mold to Vacuum table
 
3. Check seals aronud material and mold
# Insert sheet of material into Frame
4. Turn on Wall Power
# Secure Mold to Vacuum table
5. Turn on Machine Power
# Check seals around material and mold
6. Select Number of Heating Elements
# Turn on Wall Power
7. Select Duty Cycle
# Turn on Machine Power
8. Connect Pnuematic Hose
# Select Number of Heating Elements
9. Turn on Heating Element
# Select Duty Cycle
10. Move material frame into heater
# Connect Pneumatic Hose. It can be borrowed from the CNC Plasma Cutter, if not in use.
11. Close Vacuum Valve
# Turn on Heating Element
12. Turn on Vacuum Pump
# Move material frame into heater
13. Visually check if material is sagging and ready
# Close Vacuum Valve
14. Pull Material frame forward
# Turn on Vacuum Pump
15. Inspect Plastic is ready
# Visually check if material is sagging and ready
16. push level to raise vacuum bed
# Pull Material frame forward
17. Open Vacuum Valve
# Inspect Plastic is ready
18. Monitor pull of material over mold
# push level to raise vacuum bed
19. Turn off Vacuum
# Open Vacuum Valve
20. Turn off Heater
# Monitor pull of material over mold
# Turn off Vacuum
# Turn off Heater


===Safety notes===
===Safety notes===
Line 68: Line 70:




===Warning===
===Warnings===
 
* Hot Surface - Metal Frame holding material and handles will be hot.


Fire - Heat
* Fire - Material may catch fire if left unattended while lower heater is left on.


Shock - 3 Phase Power
* Crushing - Maker certain all appendages are clear, before raising pnuematic platform with mold.


Crushing - Pnuematic Platform
* Shock - High Voltage machinery (3 Phase Power) required to run motors and heating elements. Make certain cabling is secure.


===Maintenance and Repairs===
===Maintenance and Repairs===