CNC Plasma Cutter: Difference between revisions

From Pumping Station One
Daddybird (talk | contribs)
No edit summary
Daddybird (talk | contribs)
Line 54: Line 54:


=== Machine Startup ===
=== Machine Startup ===
Fill water table if not filled already. Takes about 35 minutes to fill. Be sure to have the splash guard on it so when it's filled the air does not spray water everywhere.


# Wipe down machine with clean dry clotha
# Wipe down machine with clean dry clotha