LeBlond Regal: Difference between revisions

From Pumping Station One
Aces74 (talk | contribs)
Aces74 (talk | contribs)
Line 60: Line 60:
|Per discussion Tuesday 5/29 we will top off resevoir and run as-is for a few months then replace oil
|Per discussion Tuesday 5/29 we will top off resevoir and run as-is for a few months then replace oil
|-
|-
|
|Closed
|Top off oil reservoirs, oil machine  and follow maintenance in manual as far as I can tell all reservoirs should have ISO 68 (Way) oil.
|Top off oil reservoirs, oil machine  and follow maintenance in manual as far as I can tell all reservoirs should have ISO 68 (Way) oil.
|
|
|
|Will wait until next maintenance cycle
|-
|-
|
|
|Do we need some device to help lift chucks on removal ( they weigh approx 80#) a lightweight Harbor Freight hoist is about $70
|Do we need some device to help lift chucks on removal ( they weigh approx 80#) a lightweight Harbor Freight hoist is about $70
|
|Seven
|
|Possible mount on rafters on the ceiling. but need to look for a hoist.
|-
|-
|
|
Line 78: Line 78:
|Level and check for taper
|Level and check for taper
|Seven  
|Seven  
|
|Lathe is leveled but need to check for taper in a test cut
|-
|-
|
|