LeBlond Regal: Difference between revisions
From Pumping Station One
| Line 77: | Line 77: | ||
| | | | ||
|Level and check for taper | |Level and check for taper | ||
| | |Seven | ||
| | | | ||
|- | |- | ||
| Line 85: | Line 85: | ||
| | | | ||
|- | |- | ||
| | |||
|Tool post attachment? | |||
|Jim Brink | |||
| | |||
| | | | ||
|Do we want to fit a DRO? NOTE: the Cold metals budget is getting tight for this tool we may budget this in 2019 | |Do we want to fit a DRO? NOTE: the Cold metals budget is getting tight for this tool we may budget this in 2019 | ||
| Line 97: | Line 101: | ||
| | | | ||
|Carrage lock nofunctional | |Carrage lock nofunctional | ||
| | |||
| | |||
|- | |||
| | |||
|Signage and Marking on and around the Leblonde | |||
| | | | ||
| | | | ||
| Line 107: | Line 116: | ||
| | | | ||
|Add Estop - Kickplate plus switch | |Add Estop - Kickplate plus switch | ||
| | |Ed Bennett | ||
|Spoke to Roger (888-532-5663) LeBlond does not have a product or document to retrofit this machine 5/30 | |Spoke to Roger (888-532-5663) LeBlond does not have a product or document to retrofit this machine 5/30 | ||
|- | |- | ||
| Line 116: | Line 125: | ||
|- | |- | ||
| | | | ||
|Fencing for Spectators and Floor taping | |||
| | | | ||
| | | | ||
| | |- | ||
|} | |} | ||