ShapeOko2 CNC Router: Difference between revisions

From Pumping Station One
Jim (talk | contribs)
Jim (talk | contribs)
Line 15: Line 15:


== Status ==
== Status ==
Operational as of January 2017.
Operational as of Feb 23 2018. We have plans to move the switches to the outside of the new cabinet but the machine works and is connected to the cold metals computer.


== Authorization ==
== Authorization ==