Electrical: Difference between revisions

From Pumping Station One
Tucker (talk | contribs)
Tucker (talk | contribs)
Line 26: Line 26:
|-
|-
| 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37)
| 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37)
|-
|}
<br />
The following is the result of wire tracing done 04/25/2017. Tucker
<br />
Conduits from this panel were sharpie labeled with letters for this mapping.
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
|-
! Conduit Label !! feed path !! What It Feeds
|-
| A || direct run across ceiling to junction in catwalk, from junction along catwalk and down to PP1-5 || PP1-5
|-
| B || Via PB1-2 to roof || AC
|-
| C || To junction above SE corner of boiler room, then to socket on boiler room wall || Socket PP1-1:10 on small metals wall near S end of wall
|-
| D || direct run to boiler room || main boiler room feed
|-
| E || across shop celing to catwalk || Feeds through wall to upstairs rooms
|-
| F || across shop roof to junction ~7ft from old laser exhaust, leg towards east wall dead ends, leg S drops to kitchen wall, runs into new lounge, takes 90deg through lounge wall and into safe||PP6
|-
| G || Direct to boiler room || compressor
|-
|-
|}
|}