==General Area==
==General Area==
*Paint the back stairwell railings, main doorways.
*Paint the back stairwell railings, main doorways.
*Fix the Tardis
*Fix the ventilation fan in the shop that doesn't spin up.
*Paulk workbench as a uniform replacement for tables around PS1. https://www.youtube.com/watch?v=KnNi6Tpp-ac Some features of this bench are not applicable, such as the tablesaw mount and perhaps the router table option.  Creating a CAD version of the design would speed up the construction.
*Replace the orange table in the middle of the shop (it's becoming unstable)
*Tidy Space stuff under the orange table
*Replace dust collector impeller shroud clips as they all have hairline fractures
*Upgrade cable runs throughout the space to open cable raceways.
*Upgrade cable runs throughout the space to open cable raceways.
*Load cell sensor to monitor dust collector bin with alerts and automatic shutoff when its full
*Clean up/reorganize the safe.
*Clean up/reorganize the safe.