Area Improvements and Projects: Difference between revisions
From Pumping Station One
No edit summary |
Rtystgeeke (talk | contribs) |
||
| Line 1: | Line 1: | ||
==General Area== | ==General Area== | ||
*Paint the back stairwell railings, main doorways. | *Paint the back stairwell railings, main doorways. | ||
*Upgrade cable runs throughout the space to open cable raceways. | *Upgrade cable runs throughout the space to open cable raceways. | ||
*Clean up/reorganize the safe. | *Clean up/reorganize the safe. | ||