FrontDoor Beaglebone: Difference between revisions
From Pumping Station One
Rtystgeeke (talk | contribs) |
Rtystgeeke (talk | contribs) |
||
| Line 17: | Line 17: | ||
= Next Steps = | = Next Steps = | ||
*Add enclosure and equipment label | *Add enclosure and equipment label | ||
*Check voltage pads on the BBB to see if maybe there is a bad connection at the connector. | *Check voltage pads on the BBB to see if maybe there is a bad connection at the power connector. | ||
*Remove BBB from the door and fasten to the wall by the door latch | *Remove BBB from the door and fasten to the wall by the door latch | ||
*Put USB wire through the door frame and place RFID in a static location on the wall outside. Must be placed inside a waterproof container - consider potting. | *Put USB wire through the door frame and place RFID in a static location on the wall outside. Must be placed inside a waterproof container - consider potting. | ||