Vote to Renovate the Kitchen: Difference between revisions
From Pumping Station One
No edit summary |
No edit summary |
||
| Line 14: | Line 14: | ||
*Donated Commercial Stove - Free, will install in-house. | *Donated Commercial Stove - Free, will install in-house. | ||
** Commercial Stove Vent $1000.00 - Shelly and Gerald located a commercial stove vent in great condition at Evanston Rebuilders Warehouse. It is being held without deposit for up to two weeks. If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial stove vent (4000.00). | ** Commercial Stove Vent $1000.00 - Shelly and Gerald located a commercial stove vent in great condition at Evanston Rebuilders Warehouse. It is being held without deposit for up to two weeks. If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial stove vent (4000.00). | ||
** Install a 10" ventilation duct for the commercial stove in the kitchen - $300.00. ** Cubby/Electrical Build-out - $100.00. | |||
** Install a 10" ventilation duct for the commercial stove in the kitchen - $300.00. | |||
** Cubby/Electrical Build-out - $100.00. | |||
* Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area. | * Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area. | ||
* Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor. | * Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor. | ||