ShapeOko2 CNC Router: Difference between revisions

From Pumping Station One
No edit summary
Line 31: Line 31:


Items that still need work:  
Items that still need work:  
1. Waste board repaired or replaced. Entire board is unsupported in the middle, causing it to sag.  Also, one stud has pulled up a volcano-like mountain in one part of the waste board, and needs to be milled down.  Recommend getting two $7 20mmx20mmx300mm extrusions (from Inventables or elsewhere) and T-nuts to support it in the middle (this is a common upgrade for this particular machine).
1. Waste board repaired or replaced. Entire board is unsupported in the middle, causing it to sag.  Also, one stud has pulled up a volcano-like mountain in one part of the waste board, and needs to be milled down.  Recommend getting two $7 20mmx20mmx300mm extrusions (from Inventables or elsewhere) and T-nuts to support it in the middle (this is a common upgrade for this particular machine).