Vote to Fund Space Expansion Buildout: Difference between revisions

From Pumping Station One
Dba (talk | contribs)
Undo revision 28942 by Dba (talk)
Dba (talk | contribs)
Undo revision 28941 by Dba (talk)
Line 59: Line 59:
*Upgrade the lighting.
*Upgrade the lighting.


$7750 (subtotal) + 20% (contingency funds) - $5000 (from 2016 budget vote) = $4300 (total)
Sub total: $7750
plus 20% contingency funds
minus $5000 already allocated in 2016 budget vote
Total      $4300


== Language ==
== Language ==