Vote to Fund Space Expansion Buildout: Difference between revisions
From Pumping Station One
| Line 27: | Line 27: | ||
** Install new power outlets for woodworking, cold metals and hot metals. Materials: conduit, wire, outlets. $1500 | ** Install new power outlets for woodworking, cold metals and hot metals. Materials: conduit, wire, outlets. $1500 | ||
* Plumbing | * Plumbing | ||
** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. $300 | ** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. $300 | ||
** Install work sink at the top of the stairs next to upstairs bathroom. $300 | ** Install work sink at the top of the stairs next to upstairs bathroom. $300 | ||
** Remove old sink in new lounge. | ** Remove old sink in new lounge. | ||
** | ** Replace compressed air lines. $918 | ||
*** 300' 1" pipe 480 | |||
*** 100' 3/4" pipe 108 | |||
*** 10 3/4" ball valves 110 | |||
*** 10 1" tees 70 | |||
*** miscellaneous fittings $150 | |||
* Partition between hot metals and woodworking in 3515. | * Partition between hot metals and woodworking in 3515. | ||