Vote to Fund Space Expansion Buildout: Difference between revisions

From Pumping Station One
Dba (talk | contribs)
Dba (talk | contribs)
Line 18: Line 18:
* HVAC
* HVAC
** Install AC in new lounge. $300
** Install AC in new lounge. $300
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $300
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $400
** Install ventilation duct, fan and hood for the kitchen.  Use the duct currently used by the laser. $300
** Install ventilation duct, fan and hood for the kitchen.  Use the duct currently used by the laser. $250
** Install ventilation duct and fan for small metals (jewelry).  $300
** Install ventilation duct and fan for small metals (jewelry).  $250
** Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900
** Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900
** Extend ventilation duct and add hood for hot metals. $400
** Extend ventilation duct and add hood for hot metals. $400
Line 31: Line 31:
** Install work sink at the top of the stairs next to upstairs bathroom. $300
** Install work sink at the top of the stairs next to upstairs bathroom. $300
** Remove old sink in new lounge.
** Remove old sink in new lounge.
** Compressed air for the laser and hot metals. $300
** Compressed air lines for the laser and hot metals. $250


* Partition between hot metals and woodworking in 3515.
* Partition between hot metals and woodworking in 3515.
Line 52: Line 52:
*Fix roof leaks.
*Fix roof leaks.
*Upgrade the lighting.
*Upgrade the lighting.
Sub total: $7750
        + 20% contingency funds
        - $5000 already allocated
Total      $4300


== Language ==
== Language ==