Vote to Fund Space Expansion Buildout: Difference between revisions
From Pumping Station One
| Line 18: | Line 18: | ||
* HVAC | * HVAC | ||
** Install AC in new lounge. $300 | ** Install AC in new lounge. $300 | ||
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $ | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $400 | ||
** Install ventilation duct, fan and hood for the kitchen. Use the duct currently used by the laser. $ | ** Install ventilation duct, fan and hood for the kitchen. Use the duct currently used by the laser. $250 | ||
** Install ventilation duct and fan for small metals (jewelry). $ | ** Install ventilation duct and fan for small metals (jewelry). $250 | ||
** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900 | ** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900 | ||
** Extend ventilation duct and add hood for hot metals. $400 | ** Extend ventilation duct and add hood for hot metals. $400 | ||
| Line 31: | Line 31: | ||
** Install work sink at the top of the stairs next to upstairs bathroom. $300 | ** Install work sink at the top of the stairs next to upstairs bathroom. $300 | ||
** Remove old sink in new lounge. | ** Remove old sink in new lounge. | ||
** Compressed air for the laser and hot metals. $ | ** Compressed air lines for the laser and hot metals. $250 | ||
* Partition between hot metals and woodworking in 3515. | * Partition between hot metals and woodworking in 3515. | ||
| Line 52: | Line 52: | ||
*Fix roof leaks. | *Fix roof leaks. | ||
*Upgrade the lighting. | *Upgrade the lighting. | ||
Sub total: $7750 | |||
+ 20% contingency funds | |||
- $5000 already allocated | |||
Total $4300 | |||