** Install new power outlets for woodworking, cold metals and hot metals.  Materials: conduit, wire, outlets. $1500
** Install new power outlets for woodworking, cold metals and hot metals.  Materials: conduit, wire, outlets. $1500
   
   
* Plumbing
* Plumbing
** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing. $300
** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing. $300
** Install work sink at the top of the stairs next to upstairs bathroom. $300
** Install work sink at the top of the stairs next to upstairs bathroom. $300
** Remove old sink in new lounge.
** Remove old sink in new lounge.
** Compressed air for the  
** Compressed air for the laser and hot metals. $300
 
*Obtain necessary permits if they are deemed appropriate.
*Obtain necessary permits if they are deemed appropriate.
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
Line 40: Line 40:
*Purchase and install shelving for member storage. $500
*Purchase and install shelving for member storage. $500
*Benches for general work area.
*Benches for general work area.
* Run compressed air for the laser and hot metals. $300
* Rent or purchase a section of rolling scaffolding.  This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. $300
* Rent or purchase a section of rolling scaffolding.  This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. $300