Vote to Fund Space Expansion Buildout: Difference between revisions
From Pumping Station One
| Line 16: | Line 16: | ||
The 2016 budget vote allocated $5000 for build-out. The expenses for the activities listed below should fall within that budget. If there are unforeseen expenses another vote may be necessary. | The 2016 budget vote allocated $5000 for build-out. The expenses for the activities listed below should fall within that budget. If there are unforeseen expenses another vote may be necessary. | ||
* HVAC | |||
** Install AC in new lounge. $300 | ** Install AC in new lounge. $300 | ||
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $300 | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $300 | ||