Vote to Fund Space Expansion Buildout: Difference between revisions

From Pumping Station One
Dba (talk | contribs)
Dba (talk | contribs)
Line 16: Line 16:
The 2016 budget vote allocated $5000 for build-out. The expenses for the activities listed below should fall within that budget.  If there are unforeseen expenses another vote may be necessary.
The 2016 budget vote allocated $5000 for build-out. The expenses for the activities listed below should fall within that budget.  If there are unforeseen expenses another vote may be necessary.
   
   
* HVAC
* HVAC
** Install AC in new lounge. $300
** Install AC in new lounge. $300
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $300
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $300