We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link) | We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link). | ||
This Build- | This Build-Out vote describes the initial build-out of the combined space. The type of wall or partition required to separate woodworking and hot metals has not been determined, so an estimate for that is not included. A vote for additional money for the wall may be necessary. | ||
* HVAC | |||
The 2016 budget vote allocated $5000 for build-out. The expenses for the activities listed below should fall within that budget. If there are unforeseen expenses another vote may be necessary. | |||
* HVAC | |||
** Install AC in new lounge. $300 | ** Install AC in new lounge. $300 | ||
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $300 | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $300 | ||
| Line 29: | Line 32: | ||
** Install work sink at the top of the stairs next to upstairs bathroom. $300 | ** Install work sink at the top of the stairs next to upstairs bathroom. $300 | ||
** Remove old sink in new lounge. | ** Remove old sink in new lounge. | ||
** Compressed air for the | |||
*Obtain necessary permits if they are deemed appropriate. | *Obtain necessary permits if they are deemed appropriate. | ||
*Remove temporary partition in new lounge. Paint and repair drywall if necessary. Materials: paint. | *Remove temporary partition in new lounge. Paint and repair drywall if necessary. Materials: paint. | ||
*Move equipment to new locations. | *Move equipment to new locations. | ||
* Vacuum dust from trusses, walls, etc. in 3519 shop. | |||
* | |||
*Remove tool cage walls. | *Remove tool cage walls. | ||
*Purchase and install shelving for member storage. $500 | |||
*Purchase and install shelving for member storage. $ | |||
*Benches for general work area. | *Benches for general work area. | ||
* Run compressed air for the laser and hot metals. $300 | |||
* | * Rent or purchase a section of rolling scaffolding. This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. $300 | ||
* Rent or purchase a section of rolling scaffolding. This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. | |||
This vote assumes that these tasks will be performed by the landlord before we move in: | This vote assumes that these tasks will be performed by the landlord before we move in: | ||