Vote to Fund Space Expansion Buildout: Difference between revisions

From Pumping Station One
Dba (talk | contribs)
Dba (talk | contribs)
Line 16: Line 16:


Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.
Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.
Install ventilation duct and fan for the kitchen.  Use the duct currently used by the laser.


Install ventilation duct and fan for small metals (jewelry).   
Install ventilation duct and fan for small metals (jewelry).