Quarterly Cleanup: Difference between revisions

From Pumping Station One
Jperera (talk | contribs)
Jperera (talk | contribs)
Line 60: Line 60:
*Flip middle limbo wall to create storage for Hot Metals.
*Flip middle limbo wall to create storage for Hot Metals.
*Exhaust gas ventilation to outside.
*Exhaust gas ventilation to outside.
*Wall mounted compressed air hose real near and for use with the plasma cutter.
*Acquire and install wall mounted compressed air hose real near and for use with the plasma cutter.


==Cold Metals Area==
==Cold Metals Area==