Lulzbot Taz3: Difference between revisions

From Pumping Station One
Rdoeksen (talk | contribs)
No edit summary
Rdoeksen (talk | contribs)
No edit summary
Line 6: Line 6:
|serial = KT-PR0013-5509
|serial = KT-PR0013-5509
|arrived = January 2014
|arrived = January 2014
|doesitwork = no
|doesitwork = yes
|contact = Elizabeth
|contact = Elizabeth
|where = [[CNC]] 2nd Floor
|where = [[CNC]] 2nd Floor
Line 14: Line 14:


== Status ==
== Status ==
As of 6/5/2015 nozzle unclogged, tested with ABS.
As of 6/1/2015 clogged with PLA through the length of the hot end and nozzle. Needs to be disassembled, burned out, nozzle cleaned. Probably needs replacement nozzle. Needs replacement parts for the hot end (wood discs, maybe aluminum disk) --[[User:Rdoeksen|Rdoeksen]] ([[User talk:Rdoeksen|talk]]) 18:53, 1 June 2015 (CDT)
As of 6/1/2015 clogged with PLA through the length of the hot end and nozzle. Needs to be disassembled, burned out, nozzle cleaned. Probably needs replacement nozzle. Needs replacement parts for the hot end (wood discs, maybe aluminum disk) --[[User:Rdoeksen|Rdoeksen]] ([[User talk:Rdoeksen|talk]]) 18:53, 1 June 2015 (CDT)