Bridgeport CNC Mill: Difference between revisions
From Pumping Station One
| Line 40: | Line 40: | ||
== Open Issues == | == Open Issues == | ||
'''Mechanical''' | '''Mechanical''' | ||
A replacement cover for the variable speed drive is partially installed. We need to remove the cover and replace two alignment pins, then adjust the Reeves drive. | A replacement cover for the variable speed drive is partially installed. We need to remove the cover and replace two alignment pins, then adjust the Reeves drive. | ||
| Line 55: | Line 56: | ||
'''Software''' | '''Software''' | ||
Find a process for backing up and restoring system parameters. | Find a process for backing up and restoring system parameters. | ||
| Line 68: | Line 70: | ||
'''Purchase''' | '''Purchase''' | ||
Computer for design work and to drip G code to the Heidenhain. We already have a monitor. | Computer for design work and to drip G code to the Heidenhain. We already have a monitor. | ||
| Line 75: | Line 78: | ||
'''Miscellaneous''' | '''Miscellaneous''' | ||
Clean up the BP service manual scans and add the document to the wiki. | Clean up the BP service manual scans and add the document to the wiki. | ||