2015 Budget Vote/General Area Budget: Difference between revisions
From Pumping Station One
| Line 111: | Line 111: | ||
!Item Description | !Item Description | ||
!Annual Cost | !Annual Cost | ||
|---- | |---- | ||
|Cabinet/Counter/Shelves | |Cabinet/Counter/Shelves | ||
|Materials to build those things to hold the analog and digital games of PS1. | |Materials to build those things to hold the analog and digital games of PS1. | ||
|$600.00 | |$600.00 | ||
|---- | |---- | ||
|New Walls in the Lounge | |New Walls in the Lounge | ||
|New drywall to put over the currently bare cinder block walls. | |New drywall to put over the currently bare cinder block walls. | ||
|$1,100.00 | |$1,100.00 | ||
|---- | |---- | ||
|} | |} | ||