2015 Budget Vote/General Area Budget: Difference between revisions

From Pumping Station One
Line 111: Line 111:
!Item Description
!Item Description
!Annual Cost
!Annual Cost
!Monthly Cost
|----
|----
|Cabinet/Counter/Shelves
|Cabinet/Counter/Shelves
|Materials to build those things to hold the analog and digital games of PS1.
|Materials to build those things to hold the analog and digital games of PS1.
|$600.00
|$600.00
|
|----
|----
|New Walls in the Lounge
|New Walls in the Lounge
|New drywall to put over the currently bare cinder block walls.
|New drywall to put over the currently bare cinder block walls.
|$1,100.00
|$1,100.00
|
|----
|----
|}
|}