Drinking Station: One: Difference between revisions

From Pumping Station One
Justin (talk | contribs)
Justin (talk | contribs)
Line 102: Line 102:


* Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
* Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
* Install wood trim
* Build enclosure for fridge
* Upgrade from 2 to 4 taps
* Upgrade from 2 to 4 taps
* Temperature sensors in fridge and tap line
* Temperature sensors in fridge and tap line
* Beverage line locks and RFID controls
* Beverage line locks and RFID controls