Shopbot PRS CNC router: Difference between revisions
From Pumping Station One
m Robot: Cosmetic changes |
|||
| Line 29: | Line 29: | ||
* Daily Maintenance | * Daily Maintenance | ||
** Spindle bearing warm up. | ** Spindle bearing warm up. | ||
*** The "C5" warm up routine should be run on the first job of the day. It runs the spindle at 3 speeds for 3 minutes each to warm up the bearings. | *** The "C5" warm up routine should be run on the first job of the day. It runs the spindle at 3 speeds for 3 minutes each to warm up the bearings. (When it doubt, warm it up) | ||
* Extended Maintenance | * Extended Maintenance | ||