Clausing Lathe: Difference between revisions
From Pumping Station One
Include Ed as owner. |
|||
| Line 44: | Line 44: | ||
|- | |- | ||
|Everett Wilson | |Everett Wilson | ||
|Anna Yu | |||
|- | |||
|Ryan Pierce | |||
|Anna Yu | |Anna Yu | ||
|} | |} | ||
Revision as of 14:25, 19 December 2013
| Owner/Loaner | Anna Yu |
|---|---|
| Serial Number | ? |
| Make/Model | 4900 Series |
| Arrival Date | ? |
| Usability | yes |
| Contact | Anna Yu and Ed Bennett |
| Where | Machine Shop |
| Authorization Needed | yes |
| Hackable | no |
| Estimated Value | yes |
| Host Area | {{{hostarea}}} |
Use
Cover the machine when not in use. Keep the cover off of the floor, and allow coolant to evaporate before covering again.
A resonance sets in when the variable frequency drive is set to around 50-65%.
A red dot indicates a setting that can only be changed when the lathe is off.
Certification
Contact Anna Yu for certification. Information is on the side of the lathe.
List of Currently Certified Users
| Qualified Member | Trained By |
|---|---|
| Anna Yu | Owner |
| Ed Bennett | Owner |
| Greg Teiber | Anna Yu |
| Derek Bever | Anna Yu |
| Everett Wilson | Anna Yu |
| Ryan Pierce | Anna Yu |
Suggested Tooling
Documentation and Training Materials
Part Names, and what they do: File:Clausing10inLathe4900SeriesOperatingInstructions.pdf