Board Meeting Notes 2013-08-06: Difference between revisions
From Pumping Station One
m Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3) |
|||
| (7 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
{{Board Meeting Notes | {{Board Meeting Notes | ||
| Previous MM-DD- | | Previous YYYY-MM-DD=2013-07-30 | ||
| Current YY-MM-DD=08-06-2013 | | Current YY-MM-DD=08-06-2013 | ||
| Next MM-DD- | | Next YYYY-MM-DD=2013-08-13 | ||
| YYYY=2013 | | YYYY=2013 | ||
}} | }} | ||
| Line 18: | Line 18: | ||
* Hailey | * Hailey | ||
* Eric | * Eric | ||
* Adam | |||
'''Other Members''' | '''Other Members''' | ||
| Line 36: | Line 36: | ||
==== New Business ==== | ==== New Business ==== | ||
* Electrical stuffs | * Electrical stuffs | ||
** From Tom: Let's start with a 100' of 1/2" emt ( thin wall pipe) 10 to 15 1900 boxes, one box each of 1/2" connectors and couplings, at least one 500' reel of #12 wire in colors of white,black,red, not sure what supports to use yet. | ** From Tom: Let's start with a 100' of 1/2" emt ( thin wall pipe) 10 to 15 1900 boxes, one box each of 1/2" connectors and couplings, at least one 500' reel of #12 wire in colors of white,black,red, not sure what supports to use yet. I spoke to some friends and they feel you will get flagged for the cord in the ceiling on 2nd flr, we will think of something. | ||
| Line 57: | Line 57: | ||
* went over membership report | * went over membership report | ||
* orientation program | * orientation program | ||
* went over membership leaving report- nothing terrible | |||
* fire inspection thats not a fire inspection is on monday | |||
* talked about membership harrassment issue | |||
==== | ==== Votes ==== | ||
* Vote for Eric's orientation program: | |||
** present board votes unanimously for it as it's worded | |||
* Membership Report - | * Membership Report - | ||
| Line 67: | Line 71: | ||
** Total: 239 | ** Total: 239 | ||
Meeting end: | Meeting end: 8:59 | ||