Area Host Meeting Notes 11-27-2012: Difference between revisions

From Pumping Station One
Tsaylor (talk | contribs)
no meeting on 12/4
m Robot: Cosmetic changes
 
Line 36: Line 36:
* tool certification should be moved to the backburner
* tool certification should be moved to the backburner
* Welding area is coming along decently, equipment and infrastructure is being completed
* Welding area is coming along decently, equipment and infrastructure is being completed
** Power is blocking completion. Need to run 220 and 120.
** Power is blocking completion. Need to run 220 and 120.
* Shellie needs blog and calendar access
* Shellie needs blog and calendar access
* hot metal should be split from machining. Later.
* hot metal should be split from machining. Later.