Area Host Meeting Notes 11-06-2012: Difference between revisions

From Pumping Station One
Tsaylor (talk | contribs)
No edit summary
m Robot: Cosmetic changes
 
(3 intermediate revisions by 2 users not shown)
Line 2: Line 2:
| Previous MM-DD-YYYY=
| Previous MM-DD-YYYY=
| Current YY-MM-DD=11-06-2012  
| Current YY-MM-DD=11-06-2012  
| Next MM-DD-YYYY=
| Next MM-DD-YYYY=11-27-2012
  | YYYY=2012}}
  | YYYY=2012}}


Line 30: Line 30:
** too many people are using things without certification
** too many people are using things without certification
** Nobody enforces required certification
** Nobody enforces required certification
** How do I get certified is the next question. We have to have an answer. Once a month classes?
** How do I get certified is the next question. We have to have an answer. Once a month classes?
** There's a lot of latent demand for certification, especially in the metal shop.
** There's a lot of latent demand for certification, especially in the metal shop.
** The current problem is awareness of the options available for learning things.
** The current problem is awareness of the options available for learning things.
** Signs used to work in the old shop, maybe we need more signs. With people's pictures on them.
** Signs used to work in the old shop, maybe we need more signs. With people's pictures on them.
** Set up machines with rfid readers to prevent uncertified users
** Set up machines with rfid readers to prevent uncertified users
** grace period after certification where a trainer checks their setup before they start working?  
** grace period after certification where a trainer checks their setup before they start working?  
Line 43: Line 43:
* Area hosts should provide a list of essential infrastructure by our next meeting
* Area hosts should provide a list of essential infrastructure by our next meeting


* Should we use the wiki or something easier? (google docs?)
* Should we use the wiki or something easier? (google docs?)


* Next meeting in three weeks. (All area hosts' TODO)
* Next meeting in three weeks. (All area hosts' TODO)


* create a google group and public email forward to the area hosts. (Tim's TODO)
* create a google group and public email forward to the area hosts. (Tim's TODO)
Edit 11/26/12:
Additional important issues that were identified:
* member / project storage policies
* corporate accounts with suppliers