Area Host Meeting Notes 11-06-2012: Difference between revisions

From Pumping Station One
Tsaylor (talk | contribs)
Created page with '{{Area Host Meeting Notes | Previous MM-DD-YYYY= | Current YY-MM-DD=11-06-2012 | Next MM-DD-YYYY= | YYYY=2012}} In attendance: Agenda: Minutes:'
 
m Robot: Cosmetic changes
 
(7 intermediate revisions by 2 users not shown)
Line 2: Line 2:
| Previous MM-DD-YYYY=
| Previous MM-DD-YYYY=
| Current YY-MM-DD=11-06-2012  
| Current YY-MM-DD=11-06-2012  
| Next MM-DD-YYYY=
| Next MM-DD-YYYY=11-27-2012
  | YYYY=2012}}
  | YYYY=2012}}


In attendance:
In attendance:
* Anna Yu
* Adrianna McKinley
* Colin Parsons
* Tim Saylor
* Rhys
* Steve Suspenders
* Steve Indiana
* Shawn




Agenda:
Agenda:
* Successes / concerns / requests from area hosts
* List of essential infrastructure




Minutes:
Minutes:
* The wood shop and metal shop should be two separate areas
* The certification program is broken.
** too many people are using things without certification
** Nobody enforces required certification
** How do I get certified is the next question. We have to have an answer. Once a month classes?
** There's a lot of latent demand for certification, especially in the metal shop.
** The current problem is awareness of the options available for learning things.
** Signs used to work in the old shop, maybe we need more signs. With people's pictures on them.
** Set up machines with rfid readers to prevent uncertified users
** grace period after certification where a trainer checks their setup before they start working?
** Need a simplified manual for the tools that users can learn from on their own.
** Give them a physical copy of the manuals.
* We should get a vending machine for tooling / electronic parts
* Area hosts should provide a list of essential infrastructure by our next meeting
* Should we use the wiki or something easier? (google docs?)
* Next meeting in three weeks. (All area hosts' TODO)
* create a google group and public email forward to the area hosts. (Tim's TODO)
Edit 11/26/12:
Additional important issues that were identified:
* member / project storage policies
* corporate accounts with suppliers