Java Master 2002 Coffee Roaster: Difference between revisions

From Pumping Station One
Carlfk (talk | contribs)
m Operation Checklist: remove a few pointless point
Rdpierce (talk | contribs)
 
(5 intermediate revisions by 2 users not shown)
Line 58: Line 58:
* Check (and, if necessary, empty) chaff collector
* Check (and, if necessary, empty) chaff collector
* Turn on exhaust fan (switch on wall to the right of the machine)
* Turn on exhaust fan (switch on wall to the right of the machine)
* Set air and bean temperatures
* Set air and bean temperatures (530 and 400 are good starter numbers)
* Put hopper in place over the blower vents  
* Put hopper in place over the blower vents  
* Pour in beans
* Pour in beans
Line 66: Line 66:
* Hot air heats up beans, eventually beans reach set Bean temperature
* Hot air heats up beans, eventually beans reach set Bean temperature
* Machine turns off heat, cooling water starts, machine continues to blow air to cool down beans
* Machine turns off heat, cooling water starts, machine continues to blow air to cool down beans
* Wait for bean temp to drop below 370 F, at which point yellow Reset lamp lights
* Wait for the machine to stop blowing air.
* The operator can dump the beans now, or continue to cool the beans in the chamber. To dump:
* Pull the handle to dispense beans  
** Press the Stop button.
** Pull the handle to dispense beans into hopper immediately after the beans stop moving. (Leaving them sit still too long is a fire risk.)
** Give the beans a sideways shake in the hopper and let the air vents under the hopper cool the beans.
* Bag the beans
* Bag the beans
* Turn off Heat and Power switches
* Turn off Heat and Power switches
* Turn off exhaust fan
* Turn off exhaust fan
If you are in a hurry and don't want to wait for the machine to cool the beans down:
*Wait for bean temp to drop below 370 F, at which point yellow Reset lamp lights.
*Press the Stop button.
*Pull the handle to dispense beans into hopper immediately after the beans stop moving. (Leaving them sit still too long is a fire risk.)
*Give the beans a sideways shake in the hopper and let the air vents under the hopper cool the beans.


== Safety ==
== Safety ==
Line 349: Line 354:
|Riley Pierce
|Riley Pierce
|5/13/25
|5/13/25
|-
|Daf Miller
|Riley Pierce
|9/28/25
|-
|Jack Van Boom
|Riley Pierce
|9/28/25
|-
|Jack Galbraith
|Riley Pierce
|9/28/25
|-
|Wren Parker
|Riley Pierce
|9/28/25
|-
|Mickey Price
|Riley Pierce
|11/10/25
|-
|Knute Martell
|Riley Pierce
|11/10/25
|}
|}


== Green Coffee Bean Suppliers ==
== Green Coffee Bean Suppliers ==
* Sahar International Supermarket -  Albany Park (2 miles North of PS1)  [https://maps.app.goo.gl/C2GzQn4xJR5A48VV7 4851 N Kedzie Ave, Chicago, IL 60625] - http://saharbrand.com/ 
* [https://javamaster.com/collections/coffee JavaMaster] - Sells in 3.5, 10, and 40 lbs quantities.
* [https://javamaster.com/collections/coffee JavaMaster] - Sells in 3.5, 10, and 40 lbs quantities.
* [https://www.sweetmarias.com/ Sweet Maria’s] - Sells in 1, 2, 5, 10, and 20 lbs quantities.
* [https://www.sweetmarias.com/ Sweet Maria’s] - Sells in 1, 2, 5, 10, and 20 lbs quantities.