Rockwell drill press: Difference between revisions
From Pumping Station One
| (3 intermediate revisions by 3 users not shown) | |||
| Line 56: | Line 56: | ||
These notes are for reference after authorization by a person. | These notes are for reference after authorization by a person. | ||
The spindle switch must be 'off' and the e-stop (big red button) must be in the out position (twist the button counter clockwise) before the spindle can be turned on. | The spindle switch must be 'off' and the e-stop (big red button) must be in the out position (twist the button counter clockwise) before the spindle can be turned on. Note-- If the VFD shows an E5 code check the e switch, it needs to be in the on (extended) position. | ||
Authorizations from the old DoAll drill press carry over to this machine. | Authorizations from the old DoAll drill press carry over to this machine. | ||
| Line 189: | Line 189: | ||
|Sam Olendorf | |Sam Olendorf | ||
|7/25/18 | |7/25/18 | ||
|- | |||
|Malindima Sampa | |||
|McTavish McArdle | |||
|1/7/2020 | |||
|- | |- | ||
|Michelle deLeon | |Michelle deLeon | ||
|McTavish McArdle | |McTavish McArdle | ||
|02/04/20} | |02/04/20} | ||
|} | |- | ||
|Corwin Kline | |||
|McTavish McArdle | |||
|02/04/2020 | |||
|-} | |||
[[Category:Cold Metals]] | [[Category:Cold Metals]] | ||