Clausing Lathe maintenance: Difference between revisions
From Pumping Station One
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
The [[Clausing_Lathe|Clausing Lathe]], has a very involved maintenance schedule. The lathe should be lubricated daily, or at least as often as it is used. Please refer to the [[File: | The [[Clausing_Lathe|Clausing Lathe]], has a very involved maintenance schedule. The lathe should be lubricated daily, or at least as often as it is used. Please refer to the [[File:Clausing10inLathe4900SeriesOperatingInstructions.pdf|user manual]] for the correct lubrication instructions. While users are expected to perform basic cleanup and lubrication on a per-use basis, PS1 should, on a monthly basis perform the following maintenance operations: | ||
*clean | *clean | ||
*oil ways | *oil ways | ||