Central Machinery Pipe Notcher: Difference between revisions

From Pumping Station One
Rdoeksen (talk | contribs)
Rdoeksen (talk | contribs)
No edit summary
 
(3 intermediate revisions by 3 users not shown)
Line 8: Line 8:
|arrived = 5/9/2015
|arrived = 5/9/2015
|doesitwork = yes
|doesitwork = yes
|contact = Tom Judge
|contact = Hot Metals Area Host
|where = Tool Cage
|where = Removed
|value = $80
|value = $80
|hostarea= Tool Cage
|hostarea= Tool Cage
Line 16: Line 16:
== Certification ==
== Certification ==


Using this tool requires fixing it to the drill press, as such certification is required to make sure that it is attached correctly and safely for both the user and the drill press. See owner or Area Host (at the time of this wiki entry, that means Tom Judge or Shae Kurko)
Using this tool requires fixing it to the drill press, as such certification is required to make sure that it is attached correctly and safely for both the user and the drill press. See Area Host.


== Usage Notes ==
== Usage Notes ==
Line 29: Line 29:
* After using the tool return the saw to the box, do not leave it in the tool
* After using the tool return the saw to the box, do not leave it in the tool
* After using the tool clean off any excess oil from the shaft
* After using the tool clean off any excess oil from the shaft
[[Category:Loaned Equipment]]