Talk:Board Meeting Notes 2015-10-13: Difference between revisions

From Pumping Station One
Rdpierce (talk | contribs)
Created page with "==$13k IRS Penalty== First off, MWE drafted text to include with the 2011-2013 990-EZs that explained why PS:One was late in filing and asked that penalties be abated. Are yo..."
 
 
(4 intermediate revisions by 4 users not shown)
Line 4: Line 4:


At the end of the day, the 2011-13 returns were very late, so the IRS is within its rights to fine PS:One. Still, I suggest that the Board contact MWE with this ASAP to see if any actions or appeals can reasonably be made. --[[User:Rdpierce|Rdpierce]] ([[User talk:Rdpierce|talk]]) 22:25, 13 October 2015 (CDT)
At the end of the day, the 2011-13 returns were very late, so the IRS is within its rights to fine PS:One. Still, I suggest that the Board contact MWE with this ASAP to see if any actions or appeals can reasonably be made. --[[User:Rdpierce|Rdpierce]] ([[User talk:Rdpierce|talk]]) 22:25, 13 October 2015 (CDT)
Yes, I sent the statements from MWE. I will obviously be discussing this with our professional counsel before any action is taken. --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 23:01, 13 October 2015 (CDT)


==RT 3231==
==RT 3231==
Line 13: Line 15:
We incurred three expenses pertaining to the Heidenhain encoder repairs, which should be classified under the CNC Bridgeport vote if they were incurred before the expiration of funding authority:
We incurred three expenses pertaining to the Heidenhain encoder repairs, which should be classified under the CNC Bridgeport vote if they were incurred before the expiration of funding authority:


1. UPS shipping charge to send the broken encoder to the repair facility
# UPS shipping charge to send the broken encoder to the repair facility
2. Repair cost that the repair facility charged us
# Repair cost that the repair facility charged us
3. UPS shipping charge to send the encoder back to the repair facility, as the encoder shaft friction was incorrect.
# UPS shipping charge to send the encoder back to the repair facility, as the encoder shaft friction was incorrect.


I can confirm that at the end of all this, we had a fully repaired and functioning encoder. It is currently installed in the CNC Bridgeport. --[[User:Rdpierce|Rdpierce]] ([[User talk:Rdpierce|talk]]) 22:25, 13 October 2015 (CDT)
I can confirm that at the end of all this, we had a fully repaired and functioning encoder. It is currently installed in the CNC Bridgeport. --[[User:Rdpierce|Rdpierce]] ([[User talk:Rdpierce|talk]]) 22:25, 13 October 2015 (CDT)
== Comcast Letters ==
The Comcast letters warned about downloads. We've received warnings like that before and systems people (Hef? Toba? I can't remember) did stuff to mitigate any behaviors like that. Dave took the letters and techie folks will handle it again. [[User:Skm|Skm]] ([[User talk:Skm|talk]]) 08:33, 14 October 2015 (CDT)
:I posted them under [[DMCA_Notices]], and asked people not to do that: https://groups.google.com/d/msg/pumping-station-one/ASsYYx2fiPg/MFOzxWL8RtoJ --[[User:Hef|Hef]] ([[User talk:Hef|talk]]) 07:40, 15 October 2015 (CDT)