2015 Budget Vote/General Area Budget: Difference between revisions
From Pumping Station One
m add category |
|||
| (9 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
[[ | [[Category:Budget]] | ||
[[2015 Budget Vote|Back to 2015 Budget Vote]] | |||
== Account Breakdown == | == Account Breakdown == | ||
| Line 73: | Line 74: | ||
|} | |} | ||
Total Budget Required: | Total Budget Required: $ 6,731.00 | ||
== Equipment == | == Equipment == | ||
{| class="wikitable" | {| class="wikitable" | ||
| Line 81: | Line 82: | ||
!Equipment Description | !Equipment Description | ||
!Annual Cost | !Annual Cost | ||
|---- | |---- | ||
|Wheel Truing Stand | |Wheel Truing Stand | ||
|For the Bike area to true bike wheels | |For the Bike area to true bike wheels | ||
|$350.00 | |$350.00 | ||
|---- | |---- | ||
|Game things | |Game things | ||
|Buy systems that we have peripherals and games for, but the actual consoles missing, upgrade game library in general | |Buy systems that we have peripherals and games for, but the actual consoles missing, upgrade game library in general | ||
|$200.00 | |$200.00 | ||
|---- | |---- | ||
|} | |} | ||
== Furniture == | == Furniture == | ||
{| class="wikitable" | {| class="wikitable" | ||
| Line 101: | Line 99: | ||
!Description | !Description | ||
!Annual Cost | !Annual Cost | ||
|---- | |---- | ||
|Tables | |Tables | ||
|New Tables for the lounge | |New Tables for the lounge | ||
|$300.00 | |$300.00 | ||
|---- | |---- | ||
|} | |} | ||
| Line 116: | Line 112: | ||
!Item Description | !Item Description | ||
!Annual Cost | !Annual Cost | ||
|---- | |---- | ||
|Cabinet/Counter/Shelves | |Cabinet/Counter/Shelves | ||
|Materials to build those things to hold the analog and digital games of PS1. | |Materials to build those things to hold the analog and digital games of PS1. | ||
|$600.00 | |$600.00 | ||
|---- | |---- | ||
|New Walls in the Lounge | |New Walls in the Lounge | ||
|New drywall to put over the currently bare cinder block walls. | |New drywall to put over the currently bare cinder block walls. | ||
|$1,100.00 | |$1,100.00 | ||
|---- | |---- | ||
|} | |} | ||
| Line 155: | Line 148: | ||
|} | |} | ||
== | == Safety Equipment == | ||
{| class="wikitable" | {| class="wikitable" | ||
! | !Equipment Name | ||
! | !Equipment Description | ||
!Annual Cost | !Annual Cost | ||
!Monthly Cost | !Monthly Cost | ||
|---- | |---- | ||
| | |Cryo Gloves | ||
| | |2 Pairs Cryo Gloves for handling liquid nitrogen | ||
| $250.00 | |||
| | |||
| $ | |||
| | |||
|---- | |---- | ||
|} | |} | ||
| Line 183: | Line 166: | ||
{| class="wikitable" | {| class="wikitable" | ||
!Item Name | |||
!Item Description | |||
!Annual Cost | |||
!Monthly Cost | |||
|---- | |---- | ||
|Paper Towels | |Paper Towels | ||