Shop Improvements: Difference between revisions
From Pumping Station One
Amishhammer (talk | contribs) No edit summary |
Amishhammer (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 18: | Line 18: | ||
* Move inflamables cabinet away from cold metals fire lane and against a real wall | * Move inflamables cabinet away from cold metals fire lane and against a real wall | ||
* Architects capacity drawings | * Architects capacity drawings | ||
* Heat alarms | |||
** Kitchen | |||
** Boiler room | |||
** Next to inflamables cabinet | |||
== Safety == | == Safety == | ||
| Line 31: | Line 34: | ||
** More or less in place as of this writing --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | ** More or less in place as of this writing --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | ||
* Emergency shower (rumoured to be in the works) | * Emergency shower (rumoured to be in the works) | ||
* Membership first aid courses | |||
* Outlet voltage signage | |||
== Infrastructure == | == Infrastructure == | ||