Large Format CNC Router Proposal: Difference between revisions

From Pumping Station One
Bry (talk | contribs)
m Sponsor: adding sponsor
Negativek (talk | contribs)
Account for dust collection purchases.
 
(11 intermediate revisions by 5 users not shown)
Line 5: Line 5:
* 2014-02-25 - discussion open on member list
* 2014-02-25 - discussion open on member list
* 2014-03-20 - open meeting held at PS1 to discuss the purchase
* 2014-03-20 - open meeting held at PS1 to discuss the purchase
* 2014-04-01 - Announced
* 2014-04-08 - Vote passes


== Background ==
== Background ==
Line 40: Line 42:
* $400 Electrical
* $400 Electrical
* 10% Buffer for additional shipping and install costs.
* 10% Buffer for additional shipping and install costs.
Quote: [[File:PdfFF76.pdf]]


== Potential Locations ==
== Potential Locations ==
Line 61: Line 65:


== Receipts ==
== Receipts ==
* ShopBot purchase (from wire transfer; RT ticket forthcoming) - $ 16,591.00
Grand total (in progress): $17,407.55
=== Additional Purchases ===
* [https://rt.pumpingstationone.org/Ticket/Display.html?id=295] - $42.91
* [https://rt.pumpingstationone.org/Ticket/Display.html?id=343] - $75.67
* [https://rt.pumpingstationone.org/Ticket/Display.html?id=344] - $30.90
* [https://rt.pumpingstationone.org/Ticket/Display.html?id=351] - $10.64
* [https://rt.pumpingstationone.org/Ticket/Display.html?id=352] - $10.64
* [https://rt.pumpingstationone.org/Ticket/Display.html?id=385] - $44.79
* Dust collection system - $600
Additionals total: $216.55
[[Category:Votes]]
[[Category:2014 Votes]]