Category:Broken Authorization: Difference between revisions
From Pumping Station One
No edit summary |
Rtystgeeke (talk | contribs) No edit summary |
||
| (6 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
{{NeedsUpdate|This page needs a good once over for accuracy}} | |||
The current areas have broken authorization paths. | The current areas have broken authorization paths. | ||
| Line 12: | Line 15: | ||
== On The Bridgeport Mill == | == On The Bridgeport Mill == | ||
There are currently no | There are currently no regularly scheduled authorizations happening the on manual Bridgeport, but Cold Metals Volunteer Authorizers can field a request. | ||
''I've seen folks doing authorizations with some frequency. They aren't scheduled, but it doesn't seem inaccessible.''--[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 08:29, 22 June 2015 (CDT) | ''I've seen folks doing authorizations with some frequency. They aren't scheduled, but it doesn't seem inaccessible.''--[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 08:29, 22 June 2015 (CDT) | ||
This currently requires Tier 1 Authorization. | This currently requires Tier 1 Authorization. https://wiki.pumpingstationone.org/Tier_1_Cold_Metals_Authorization | ||
== On Metal Shop Basic Tools (Tier 1) == | == On Metal Shop Basic Tools (Tier 1) == | ||
| Line 32: | Line 35: | ||
== Hot Metals == | == Hot Metals == | ||