Jalenko Burn-out Furnace: Difference between revisions

From Pumping Station One
Jperera (talk | contribs)
No edit summary
Mskilton (talk | contribs)
mNo edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 9: Line 9:
|doesitwork = yes
|doesitwork = yes
|contact = Eric Stein
|contact = Eric Stein
|where = hot metals
|where = Removed
|value = $70
|value = $70
|hostarea = Hotmetals
|hostarea = Hot Metals
}}
}}


Line 54: Line 54:
*Hack together some type of replacement guage
*Hack together some type of replacement guage
**The old guage was connected to some type of ceramic temperature probe of unknown variety and was disintegrating. If we can get the same type probe it may work again, but more useful would be a digital read out
**The old guage was connected to some type of ceramic temperature probe of unknown variety and was disintegrating. If we can get the same type probe it may work again, but more useful would be a digital read out
[[Category:Metalworking]]
[[Category:Metal Casting]]