BOSS Maintenance: Difference between revisions
From Pumping Station One
| (One intermediate revision by the same user not shown) | |||
| Line 19: | Line 19: | ||
# Screw the threaded slotted tube back in. | # Screw the threaded slotted tube back in. | ||
# Screw back in the laser nozzle. | # Screw back in the laser nozzle. | ||
== Changing/Replacing BOSS Tube == | |||
1. Purchasing a 150W tube | |||
2. Grounding | |||