Vote to Renovate the Kitchen: Difference between revisions
From Pumping Station One
No edit summary |
|||
| (4 intermediate revisions by the same user not shown) | |||
| Line 7: | Line 7: | ||
* Mailing List Announcement: 10/01/16 | * Mailing List Announcement: 10/01/16 | ||
* Officially Proposed: 10/04/16 | * Officially Proposed: 10/04/16 | ||
* To be Voted on: | * To be Voted on: 10/18/16 | ||
== Background == | == Background == | ||
| Line 16: | Line 16: | ||
<ol> | <ol> | ||
<li>Donated Commercial | <li>Donated Commercial Range - Free, will install in-house.</li> | ||
* | * Range Vent Hood ~$1500.00 | ||
* Install a 10" ventilation duct for the commercial | * Install a 10" ventilation duct for the commercial range in the kitchen ~$300.00. | ||
* Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial | * Cubby/Electrical Build-out ~$100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range. | ||
<li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.</li> | <li>Cabinetry and wall re-framing/re-enforcing ~$1000.00 - The kitchen will be expanding with the relocation of beer church. Upper and lower cabinets will be installed in this new dining area.</li> | ||
<li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li> | <li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li> | ||
<li>Equipment $600.00 - Pantry/dry food storage, stainless steel island cart w/casters, stainless steel table/s.</li> | <li>Equipment ~$600.00 - Pantry/dry food storage, stainless steel island cart w/casters, stainless steel table/s.</li> | ||
<li>Optional Renovation Enhancements - Should the budget allow due to savings from the purchase of discounted and/or donated materials, the below shall be included in this vote.</li> | <li>Optional Renovation Enhancements - Should the budget allow due to savings from the purchase of discounted and/or donated materials, the below shall be included in this vote.</li> | ||
| Line 40: | Line 40: | ||
</ol> | </ol> | ||
Sub total: $ | Sub total: $3500 | ||
plus 20% contingency funds | plus 20% contingency funds | ||
Total $ | Total $4200.00 | ||
== Language == | == Language == | ||
We authorize the board to spend up to $ | We authorize the board to spend up to $4200.00 for equipment, materials and supplies to renovate the kitchen. | ||
The funding for this vote will expire 6 months from the date of approval. | The funding for this vote will expire 6 months from the date of approval. | ||