Board Meeting Notes 2012-09-25: Difference between revisions

From Pumping Station One
Created page with '{{Board Meeting Notes | Previous MM-DD-YYYY=09-18-2012 | Current YY-MM-DD=09-25-2012 | Next MM-DD-YYYY=10-02-2012 | YYYY=2012}} Meeting start: XX:XX pm ===Attendance=== *…'
 
Wikibot (talk | contribs)
m Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3)
 
(5 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Board Meeting Notes  
{{Board Meeting Notes  
| Previous MM-DD-YYYY=09-18-2012
| Previous YYYY-MM-DD=2012-09-18
| Current YY-MM-DD=09-25-2012  
| Current YY-MM-DD=09-25-2012  
| Next MM-DD-YYYY=10-02-2012
| Next YYYY-MM-DD=2012-10-02  
  | YYYY=2012}}
  | YYYY=2012}}


Meeting start: XX:XX pm
Meeting start: 7:05 pm


===Attendance===
=== Attendance ===


*  
* Tim
* Patrick
* Shawn
* Ishmael
* Dan
* Steve


===Agenda===
=== Agenda ===
   
   
====Old Business====
==== Old Business ====


* Ishmael
* Ishmael
Line 20: Line 25:
* Tim
* Tim
** inventory and ownership status of old landlord's stuff left on our side.
** inventory and ownership status of old landlord's stuff left on our side.
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
** Bill-of-materials for the workshop build-out
** Bill-of-materials for the workshop build-out


Line 40: Line 45:
** We need to improve our implementation of the tool certification process.
** We need to improve our implementation of the tool certification process.


====New Business====
==== New Business ====


* Financial/membership report
* Financial/membership report
* TIG welder is coming in soon
* TIG welder is coming in soon
* Donation of oxyacetylene torch setup and tanks (welding and cutting) ?
* Donation of oxyacetylene torch setup and tanks (welding and cutting) ?
* Arrange for gas to be billed to us before the 28th.
=== Minutes ===
* Ishmael
** Have we received the stuff Rhys needs for access control? - Yes
* Tim
** inventory and ownership status of old landlord's stuff left on our side. - None.
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back) - Letter sent with delivery conf, wait 10 biz days
** Bill-of-materials for the workshop build-out - None
* Patrick
** Cleaning service status - Still waiting for a confirmed day they can come work. Patrick should talk to Geoffrey about it.
** Any luck finding the missing Weller wireless soldering iron? - Found!
* Dan
** Install shop air valve between our area and Tony's and attach our compressor to the system. - None. May take a while. Tim will ask tony for a quote to separate the system.
* Steve
** We need some replacement part for the laser cutter. (a belt and the auto-focus spring) - Replacement parts ordered. Board is fried though, need to return it for warranty replacement.
** New bearings for mill will be installed tonight.
* Shawn
* Unassigned
** Change address update.
** We need to verify the code status of the fire door in the metal shop
** We need to improve our implementation of the tool certification process.
* New business
** Financial/membership report - 155 members, 86 starving, 69 full
** Donation of oxyacetylene torch setup and tanks (welding and cutting) ? - Steve and Dan to handle this if/when it happens.
** Arrange for gas to be billed to us before the 28th. - Ishmael to handle this by the 28th.
** New electronics area host needs to be selected. - Tim to email the members list asking for volunteers.


===Minutes===


   
   
Meeting End: XX:XX pm
Meeting End: 7:30 pm