Board Meeting Notes 2012-09-18: Difference between revisions

From Pumping Station One
No edit summary
Wikibot (talk | contribs)
m Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3)
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Board Meeting Notes  
{{Board Meeting Notes  
| Previous MM-DD-YYYY=09-11-2012
| Previous YYYY-MM-DD=2012-09-11
| Current YY-MM-DD=09-18-2012  
| Current YY-MM-DD=09-18-2012  
| Next MM-DD-YYYY=09-25-2012
| Next YYYY-MM-DD=2012-09-25  
  | YYYY=2012}}
  | YYYY=2012}}


Meeting start: 07:06 pm
Meeting start: 07:06 pm


===Attendance===
=== Attendance ===


* Tim Saylor
* Tim Saylor
Line 15: Line 15:
* Eric Stein
* Eric Stein


===Agenda===
=== Agenda ===
   
   
====Old Business====
==== Old Business ====


* Ishmael
* Ishmael
Line 25: Line 25:
* Tim
* Tim
** inventory and ownership status of old landlord's stuff left on our side.
** inventory and ownership status of old landlord's stuff left on our side.
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
** Status of money owed by the old landlord? (Steve's letter formally asking for the deposit back)
** Bill-of-materials for the workshop build-out
** Bill-of-materials for the workshop build-out


Line 44: Line 44:
** We need to improve our implementation of the tool certification process.
** We need to improve our implementation of the tool certification process.


====New Business====
==== New Business ====


* Financial/membership report
* Financial/membership report
Line 50: Line 50:
* Donation of oxyacetylene torch setup and tanks (welding and cutting) ?
* Donation of oxyacetylene torch setup and tanks (welding and cutting) ?


===Minutes===
=== Minutes ===


* The entry system equipment has been ordered to be delivered to Rhys
* The entry system equipment has been ordered to be delivered to Rhys
Line 69: Line 69:
* The Power Wheels guys will keep an eye out for the missing Weller soldering iron in case it was put in the Maker Faire Evanston supplies.
* The Power Wheels guys will keep an eye out for the missing Weller soldering iron in case it was put in the Maker Faire Evanston supplies.
   
   
Meeting End: 07:35 pm
Meeting End: 07:35 pm