Board Meeting Notes 2012-06-12: Difference between revisions
From Pumping Station One
No edit summary |
m Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3) |
||
| (7 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
{{Board Meeting Notes | {{Board Meeting Notes | ||
| Previous MM-DD- | | Previous YYYY-MM-DD=2012-06-05 | ||
| Current YY-MM-DD=06-12-2012 | | Current YY-MM-DD=06-12-2012 | ||
| Next MM-DD- | | Next YYYY-MM-DD=2012-06-19 | ||
| YYYY=2012}} | | YYYY=2012}} | ||
Meeting start: | Meeting start: 07:25 pm | ||
===Attendance=== | === Attendance === | ||
===Agenda=== | * Tim Saylor | ||
* Patrick Callahan | |||
* Shawn Blaszak | |||
* Ishmael Rufus | |||
* Eric Stein | |||
* Steve Finkelman | |||
=== Agenda === | |||
====Old Business==== | ==== Old Business ==== | ||
* Did anyone figure out utilities yet? | * Did anyone figure out utilities yet? | ||
* Any news about buying the table saw from Steve (or the over-paid rent he owes us)? | * Any news about buying the table saw from Steve (or the over-paid rent he owes us)? | ||
* Network roll-out status: Internet is partially worked out, although Atmosphere is dragging their feet. This is somewhat concerning. All physical equipment not related to the | * Network roll-out status: Internet is partially worked out, although Atmosphere is dragging their feet. This is somewhat concerning. All physical equipment not related to the up-link is purchased and ready for install, but not fully installed yet | ||
====New Business==== | ==== New Business ==== | ||
* Financial/membership report | * Financial/membership report | ||
* Move plans | * Move plans | ||
===Minutes=== | === Minutes === | ||
* We still need to set up garbage dumpster for the new space | |||
* We have not heard back from Steve regarding the money we have overpaid him | |||
** Tim will try to meet with Terry during the business day | |||
* We need to set up mail service to the new space | |||
* The network installation is progressing but we still need to sign the contract with the ISP | |||
** The ISP should be installed on Thursday | |||
* Ishmael gave the financial/membership report | |||
** Starving: 77 | |||
** Full: 57 | |||
* The move: | |||
** Dave will be bringing his truck on Sunday | |||
** Stuff small enough to not need the truck will be brought over ahead of time | |||
** The loft needs to be taken down | |||
* The online discussion about purchasing a sale priced CNC embroidery machine was discussed by the board | |||
** As per the online discussion, the units that are on sale aren't really what we want and will be passed on | |||
** Since the unit we actually want is significantly more expensive, it was agreed that we should hold off on purchasing it until we are securely moved into the new space. | |||