Kegerator: Difference between revisions

From Pumping Station One
Ashanan (talk | contribs)
New page: Category:Member Projects == Concept == This is what I envision as our final kegerator set up: [http://www.mikebeer.net/chestfreezer.htm] [http://www.west-point.org/users/usma1986/428...
 
m Robot: Cosmetic changes
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Category:Member Projects]]
== Concept ==
== Concept ==
This is what I envision as our final kegerator set up:
This is what I envision as our final kegerator set up:
Line 8: Line 7:


With the front mounted tap set up from the first link, using the
With the front mounted tap set up from the first link, using the
materials/construction instructions from the second. Once we gather
materials/construction instructions from the second. Once we gather
the materials we should be able to get it together in a couple days.
the materials we should be able to get it together in a couple days.
That said, I would like to have it set up for at least one beer by the
That said, I would like to have it set up for at least one beer by the
time our P-P-Power Ale is ready to drink. This will save us the
time our P-P-Power Ale is ready to drink. This will save us the
pleasure of a bottling party, and enable us to drink it in a day or
pleasure of a bottling party, and enable us to drink it in a day or
so, rather than waiting for a secondary fermentation.
so, rather than waiting for a secondary fermentation.
Line 20: Line 19:
ft.)
ft.)


- 1 x 6's (also about 16 ft)
- 1 x 6's (also about 16 ft)


- Polyurethane/stain of some sort
- Polyurethane/stain of some sort
Line 47: Line 46:


- 16 x hose clamps
- 16 x hose clamps
[[Category:Past Projects]]