3D printer purchase: Difference between revisions

From Pumping Station One
Dbever (talk | contribs)
m Robot: Cosmetic changes
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
==Sponsor==
This motion passed on December 17, 2013
 
== Sponsor ==


[[User:Dbever | Derek Bever]]
[[User:Dbever | Derek Bever]]


==History==
== History ==


* 2013-11-18 - Initial draft
* 2013-11-18 - Initial draft
* 2013-12-10 - Proposed vote date, failed to meet quorum
* 2013-12-17 - Rescheduled vote date
* 2013-12-17 - vote passed


==Background ==
== Background ==


Pumping Station: One is rapidly approaching 300 members. The laser engraver and 3D printers tend to be the most interesting (Shiny! Cool!) machines for new members, and certainly serve as a motivation for joining PS:1. We committed to having a high-quality laser. We should continue the trend of obtaining high-quality technology for our members and supplement (or replace) some of our current 3D printing equipment with a recent machine from a reputable manufacturer.
Pumping Station: One is rapidly approaching 300 members. The laser engraver and 3D printers tend to be the most interesting (Shiny! Cool!) machines for new members, and certainly serve as a motivation for joining PS:1. We committed to having a high-quality laser. We should continue the trend of obtaining high-quality technology for our members and supplement (or replace) some of our current 3D printing equipment with a recent machine from a reputable manufacturer.
Line 30: Line 35:
Expected total cost of purchase: $2500 or less.
Expected total cost of purchase: $2500 or less.


[[Category: Votes]][[Category: 2013_Votes]]
Vote passed on 12-17-13
 
Quorum was 31 and 39 votes were cast
** Yes - 36
** No - 0
** Present - 3
 
[[Category:Votes]]
[[Category:2013 Votes]]